Driven by new regulations as well as consumer performance requirements, there has been a global increase in demand for a broad range of cast, extruded and machined aluminum parts. Aluminum parts producers are looking to metals recovery systems to control costs of primary and secondary aluminum purchases and to mitigate their operating cost by capturing value from byproducts.

Understanding rate limiting factors when sizing your secondary aluminum recovery system

Understanding the true rate limiting factors when configuring and sizing a metals recovery system is critical to realizing the full potential of the system. Additionally, managing energy within the system will have a large impact on the operating cost and uptime/maintainability of the system.

Historically, parts producers have focused on dryer and melt furnace capacities as the rate limiting factor when sizing their system. The practical reality, when sizing a system, is that vent stream emissions may be the real rate limiting factor controlling your overall recovery system’s capacity.

One of the first steps when evaluating a potential metals recovery project should be to understand the expected fluids and contaminants in the feedstock. Given these input conditions, a concurrent analysis of the thermal processing load for the drying system and the expected constituents in the vent stream can be conducted. From these calculations, an estimate of the projected emissions loading from the operation can be determined.

Based on the findings from the above emissions calculations, the appropriate air pollution control system can be sized. While thermal oxidation of these vent streams is a proven solution to mitigate the VOC (Volatile Organic Compound) emissions from these sources, many lessons have been learned on these specific applications through the years, that allow for the optimization of these systems.

Dealing with particulate matter on the inlet, avoiding formation of HAPs (Hazardous Air Pollutants) at the discharge of the unit, and withstanding the abrasive atmosphere within system, are all challenges which have been successfully overcome.

However, despite these system application improvements, even the most efficient drying system will produce some level of particulate matter emissions. Choosing a design which limits that potential will reduce the demand on the downstream PM removal system and reduce any subsequent loading on the downstream thermal oxidizer. Within the Thermal Oxidizer itself, burner placement/orientation, combustion chamber configuration and the design of primary and secondary heat exchangers will all contribute to a system which can operate in the face of the particulate matter loading one can realistically expect to see during standard operation.

While in absolute terms we are seeing relatively low natural gas costs today, at the scale of many captive recycling operations, recovering waste heat from the process can produce a significant annual cost savings and overall reduction in facility greenhouse gas emissions.

A perfect example of the cost savings benefits of secondary heat recovery in aluminum scrap recycling can be found in a installation at a merchant metals recycling operation in Arkansas. The existing system was an early design pretreatment system with rudimentary drying technology. The custom engineered system upgrade included an innovative design of a thermal oxidizer for this application equipped with a quad downflow inlet plenum, axial mounted down-fired burner as well as primary and secondary heat exchangers (see image to the [right]). This configuration maximized turbulence in the combustion chamber, resulting in excellent destruction efficiency and protected the burner from potential particulate carryover.

The energy saved from the introduction of primary and secondary heat recovery resulted in a payback for the new thermal energy system (oxidizer and dryer heat source) of less than 1.5 years! This exceptional payback was achieved at a still relevant fuel value of $3.85/MMBtu.

Fast forward to today and we are seeing advances in aluminum scrap pre-treatment drying technology that not only results in reduced particulate carryover but also a combined increase in VOC loading, a reduction in permittable emissions levels, as well as demands for even higher uptime and serviceability of the systems.

In response to these changes thermal oxidizer designs have evolved along with the advances in pre-treatment drying technology. Understanding and projecting loading and sizing remains a critical part of the system configuration. The latest systems being deployed incorporate multi-pass modular heat exchangers to maximize system energy efficiency as well as serviceability. Additionally, large diameter stainless steel shell and tube heat exchangers provide exceptional balance of wear resistance, life expectancy, maintainability as well as initial procurement cost.

The rendering shown at the [right] highlights the latest design recuperative thermal oxidizer for a global tier 1 aluminum parts producer. This system is part of an integrated melt system being provided by an industry leading metals recovery systems provider. The system is sized to support pre-treatment of 3 tonnes/hour of aluminum chips through a jet drying system and includes primary heat recovery to minimize energy consumption. This unit incorporates innovative packaging features to minimize the overall system footprint while at the same time insuring ease of maintenance and service.

The units modular 2 pass secondary shell and tube heat exchanger configuration provides for ease of maintenance with strategically placed access doors and large diameter stainless steel tubes for maximum service life. In addition, the modular design simplifies installation and allows for quick change out in the future when the heat exchanger is no longer serviceable.

Another key design element, shown in the image at the [left], is the insulated stack. At 65’ tall and with a diameter of 42”, the design and materials of construction were critical to meeting the customer’s performance requirements as well as capital budget. An insulated design allowed the team to optimize the materials selection and reduce the overall project capital cost.

Understanding and applying best practices in aluminum scrap recycling systems is key to realizing the full potential of your recovery system. Recognizing that a 1% deviation in contaminant levels can translate to more than a 2% move in metals recovery highlights the value in investing in the latest recovery technologies. By focusing on properly sizing and configuring the thermal oxidizer early in the design process, operators will be able to realize the full potential of the metals recovery system and avoid wasted melt furnace capacity. The capacity through the system can only be as great as the emissions limits permit. Whether for a new system or retro-fit of an existing plant, focusing on addressing emissions performance rate limiting factors will insure overall project success.

By Brian Wendt, Project Engineer, Epcon Industrial Systems, LP
With Contributions from Adam Halsband, Manager of Marketing and Business Development, Epcon Industrial Systems, LP